Locked Up

Drove past our site today and breathed a huge sigh of relief as construction was on the move again this week. They’ve installed our beautiful front door now and locked up the house. It’s raw and needs to be stained but I love it already.

dscf2946

For our laundry we’re using a LIN1 door, also needs to be stained.

dscf2948

I got a snap of the inside through the back door, looks like the carpenters have been hard at work installing all the architraves and skirting, it’s looking like a house on the inside now. The gyprock has been sanded down and is ready for painting. You can see the pantry door and the fridge space from this pic.

dscf2954

Got a pic of the powder room too, can see the waterproofing has been done.

dscf2950

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s